|
01
|
note
|
|
Select:
m2
ft.2
Step 1. Basement Floor Area:
|
|
|
|
|
02
|
8-110(c)
|
|
Revised Basement Floor Area in m2 »
|
0 m2
|
|
|
03
|
8-110(a),(b)
|
|
Select:
m2
ft.2
Step 2. Add'l Floor Areas Combined:
|
|
|
|
|
04
|
|
|
Conversion of row 3 value into m2 »
|
0 m2
|
|
|
05
|
8-110(a),(b),(c)
|
|
Total Floor Area for Demand Calculation in m2 »
|
0 m2
|
|
|
06
|
8-200(1)(a)(i),(ii)
|
|
Watts Assigned To Above Total Floor Area »
|
0 W
|
|
07
|
8-200(1)(a)(iii)
|
|
Step 3. Space Heating Loads:
|
W
|
|
|
|
08
|
62-116(1),(2)
|
|
Space Heat Watts Revised »
|
0 W
|
|
|
09
|
8-200(1)(a)(iii)
|
|
Step 4. Air-Conditioning Loads:
|
W
|
|
|
|
10
|
8-106(4)
|
|
Step 5. Check box if space heat and air-conditioning can be on simultaneously =>
|
|
|
|
|
11
|
|
|
Watts Assigned To Space Heat and AC Loads »
|
0 W
|
|
12
|
|
|
Step 6. Electric Range:
|
W
|
|
|
|
13
|
8-200(1)(a)(iv)
|
|
Watts Assigned To Electric Range »
|
0 W
|
|
14
|
8-200(1)(a)(v)
|
|
Step 7. Water Heaters: Tankless Water Heaters; Water Steamers; Pool, Tub & Spa Water Heaters:
|
W
|
|
0 W
|
|
15
|
8-200(1)(a)(vi)
|
|
Step 8. Electric Vehicle Charging Equipment Loads:
|
W
|
|
0 W
|
|
16
|
8-200(1)(a)(vii)
|
|
Step 9. Additional Loads: With Rating Greater Than 1500 Watts:
|
W
|
|
|
|
17
|
8-200(1)(a)(vii)
|
|
Watts Assigned To Additional Loads »
|
0 W
|
|
18
|
|
|
TOTAL DEMAND WATTS »
|
0 W
|
|
19
|
|
|
TOTAL DEMAND AMPS »
|
0 A
|
|
20
|
8-200
|
|
Minimum Service Amps:
|
|
|
21
|
Table 2 or 4
|
|
Hot Conductor Size:
|
|
|
22
|
|
|
Meter Base Rating:
|
|
|
23
|
Table 13
|
|
Main Fuse / Breaker:
|
|
|
24
|
10-812
|
|
Service Grounding Conductor:
|
|
|
25
|
Table 41
|
|
Service Bonding Jumper:
|
|
|
26
|
Table 6
|
|
Service Conduit Size (threaded, rigid metal):
|
|
|
27
|
8-108
|
|
Service Panel Size (minimum):
|
|